Since 1974 Viglacera has made building materials and developed 19 industrial parks in Vietnam and Cuba. In Thai Nguyen it develops Song Cong II and Tay Pho Yen, about 40 minutes from Noi Bai International Airport.

  • 19Parks in Vietnam and Cuba
  • 6,000+haIndustrial land bank
  • ~20bn USDFDI attracted

Illustrative image, not a photo of an actual park

ViglaceraCorporation

Founded in 1974, Viglacera Corporation JSC (HOSE: VGC) makes building materials and develops industrial parks and urban areas.

In 1990 Viglacera produced the first construction glass made in Vietnam, and in 1998 it opened the first float glass plant built by a Vietnamese company. Its industrial park business now covers 19 parks in Vietnam and Cuba. Viglacera Thai Nguyen JSC is a subsidiary of the Corporation and develops the two parks in Thai Nguyen.

  • Land ready to buildFactories go up on cleared land
  • Trained workforceViglacera's vocational college supplies technical staff
  • Housing next to the parksHomes for experts and workers beside the industrial parks
About Viglacera Thai Nguyen (Vietnamese)
Map of the 19 Viglacera industrial parks in northern and central Vietnam and Cuba, including Song Cong II and Tay Pho Yen
19 Viglacera parks, click for the full map

Viglacera in figures

Founded
1974
Industrial plants
31
Subsidiaries and associates
26
Employees
6,000+
Urban and housing projects
18
Exports to
40+countries

Source: viglacera.com.vn, About section (FDI stated as “nearly USD 20 billion”).

Land available intwo industrial parks

Industrial parkSong Cong IIPhase 2

  • Two 110 kV substations, 6×63 MVA
  • Wastewater to QCVN 40:2025 class A
  • 7 km to Thai Nguyen city, 55 km to Noi Bai
Total area
296ha
Zone 01
175ha
Zone 02
121ha

Operating period 2024 – 2074

Roads, power, water, wastewater treatment, telecoms, fire protection and security are built as one system. The park targets manufacturing, technology and supporting industries.

See the plan and free plots

Master planSong Cong II IP – phase 2

Total area
296ha
Operating period
2024 – 2074
Zone 2
Ready now
  • Available
  • Pre-registration
  • Leased

Technicalinfrastructure

Power, water, wastewater, roads and telecoms are in place before the land is handed over. Figures below are for Song Cong II.

Regional map from the two parks to Hanoi, airports, seaports and border gates

Regionalconnections

  • 40minto Noi Bai airport
  • 50minto central Hanoi
  • 140minto Hai Phong port

Choose a destination to see it on the map.

    • In northern Vietnam's main industrial region
    • Land rent payable in one lump sum
    • High ground, firm and stable soil
    • Stable, high-capacity power supply

    Lease price& utility fees

    Industrial park
    ha

    From 1 to 30 ha. The largest free plot now is 12.21 ha.

    Estimated lease, one-time payment – Calculating…

    USD 105/m² is an assumption taken from the current website banner, for reference only. Lease term 2024–2074.

    • Infrastructure leaseDepends on plot location and size
    • Land rentSet by the provincial People's Committee
    • Service and maintenance feePaid yearly
    • ElectricityState tariff
    • WaterPaid monthly
    • Wastewater feeDepends on plot location and size

    Corporateincome tax (CIT)

    17%

    Preferential rate for 10 years for eligible projects at Tay Pho Yen: 2 years exempt, then 50% off for the next 4 years.

    Under chapter V of Decree 320/2025/ND-CP dated 15 December 2025.

    Target sectors

    • High-tech, electronics
    • Infrastructure, construction, logistics
    • Supporting industries
    • Hi-tech agriculture, food processing
    • Precision engineering
    • Clean energy, environment
    • New materials
    • Healthcare, support services
    Import duty: 7 exemptions
    1. Goods imported to make export products
    2. Goods imported for processing export products
    3. Goods for scientific research and technology development
    4. Goods for environmental protection on the incentive list
    5. Goods forming fixed assets of incentivised projects
    6. Materials and components not yet made in Vietnam
    7. Up to 5 years on materials and components for special-incentive projects and high-tech companies

    Under Law 107/2016/QH13 on export and import duties, amended by Law 90/2025/QH15.

    A clearinvestment procedure

    ViglaceraOne-stop service

    Our staff guide your paperwork from the land sub-lease MOU to the land use right certificate.

    1. 01Sign the land sub-lease MOU
    2. 02Apply for the investment registration certificate
    3. 03Register the company, tax code and seal
    4. 04Sign the land sub-lease contract, receive the land
    5. 05Agree connection points: water, wastewater, power, gate
    6. 06Environmental impact assessment approval
    7. 07Fire protection design approval
    8. 08Construction design appraisal
    9. 09Apply for the construction permit
    10. 10Build the factory, install machinery
    11. 11Obtain the land use right certificate

    Steps 5 and 6 run in parallel. Step 9 can start right after step 4. Step 10 starts once steps 1 to 9 are done, step 11 after step 10.

    The workforcebehind growth

    Regional minimum wage, region II
    VND 4,730,000/month about USD 182
    Workers
    USD 300 – 500/month
    Engineers, technicians, office staff
    USD 350 – 640/month
    Managers, chief accountants, foremen
    USD 680 – 1,100/month

    Effective 1 January 2026 under Decree 293/2025/ND-CP.

    Investorsat Song Cong II

    POSCO Future M, Huali, LaserFlex, JY and Hunonic operate in the park. Viglacera's industrial parks host more than 400 investors.

    Some companies already operating

    • POSCO Future M
    • Huali
    • LaserFlex
    • JY
    • Hunonic
    • Huali signed its land lease at the Phase 2 groundbreaking, 10 March 2025
    “We highly value Thai Nguyen province's investment environment and competitiveness in attracting FDI…”
    Eom Gi-chenCEO, POSCO Future M
    Quoted on the Viglacera Thai Nguyen website (Vietnamese)

    Newsfor investors

    Tin tức (VI)

    Headlines and dates are illustrative. Full articles are in Vietnamese in this demo.

    Book asite visit

    Pick a date. Our team will call to confirm and prepare plots that fit your needs. Interpreters for English, Korean, Chinese and Japanese.

    +84 826 236 236