Investment procedureand one-stop service

Viglacera guides your company through the entire investment process, from the principle agreement on the land sub-lease to receiving the land use right certificate.

One-stopservice

A single point of contact at Viglacera Thai Nguyen works with your company from the first site visit until the factory has all its permits.

  • Choose a plot

    Quotation per plot, layout drawings and a site visit with an English, Korean, Chinese or Japanese interpreter.

  • Paperwork guidance

    Guidance on the sequence and documents for each of the 11 steps, including the steps that run in parallel.

  • Utility connections

    Agreement on connection points for water supply, wastewater drainage and power, and on the gate location.

  • Connecting resources

    Links to labour recruitment and construction contractors for the factory-building phase.

Specialist and engineer reviewing project documents on site
ViglaceraOne-stop serviceGuidance for companies throughout the investment process.

A transparentinvestment procedure

Hover over or tap a step to see which steps must be finished before it. Steps 5 and 6 run in parallel, and step 9 can be filed right after step 4.

Land lease and legal entity

  1. 01Sign the principle agreement on the land sub-lease
  2. 02Apply for the Investment Registration Certificate (IRC)
  3. 03Register the company, tax code and company seal
  4. 04Sign the official land sub-lease contract and take over the land

Connections, environment, fire safety

  1. 05Agree on connection points for water, wastewater, power and the gate location 06Approval of the environmental impact assessment report Runs in parallel
  2. 07Fire prevention and fighting design appraisal
  3. 08Appraisal of the construction design following the basic design

Construction and completion

  1. 09Application for the construction permitCan be filed right after step 4
  2. 10Build the factory and install machinery and equipment
  3. 11Register the land use right certificateAn independent step, after step 10

Select a step to see what must be done before it can start.

Connectinglabour and contractors

Two things your company needs right after receiving land: a contractor to build the factory and workers for the day of operation.

Labour recruitment

Workforce in the province
~840thousand
Training institutions
37

The Viglacera group has a vocational college that supplies technical workers. Companies in the parks post job openings on the website.

Construction contractors

Maximum building coverage
70%
Height limit
5floors

Viglacera posts infrastructure tender notices on the website. Contractors building factories should review the construction management rules before designing.

ProcedureFAQ

For questions about the paperwork for your specific project, send them to our specialist for guidance tailored to your case.

How far does the one-stop service go?

Our specialist guides your company through the whole investment process, across 11 steps from the principle agreement on the land sub-lease to receiving the land use right certificate.

Which steps can run in parallel?

Step 5 (agreeing connection points) and step 6 (environmental impact assessment) run at the same time. Step 9 (construction permit) can be filed right after step 4.

When can I start building the factory?

Step 10 (building the factory and installing machinery) starts only after steps 1 to 9 are completed.

Where can I recruit workers?

Thai Nguyen has about 840,000 workers and 37 training institutions. The Viglacera group has a vocational college that supplies technical workers.