Industrial ParkTay Pho Yen

Pho Yen, Thai Nguyen provincePhase 1, operating 2026–2076

Total area
499 ha
Preferential CIT rate
17 % / 10 years
To Samsung Yen Binh
5–7 min

Rendering of Tay Pho Yen IP from the brochure.

A key projectof 499 ha

Tay Pho Yen IP Phase 1 was planned from the start to Viglacera EcoSmart IP standards: modern infrastructure, smart operation and green, sustainable development, in line with the trend towards next-generation industrial investment.

Total area
499ha
CIT
17%
Incentive period
10years

Operating period 2026 – 2076

A 499.07 ha park targeting high technology, electronics, supporting industries, mechanical engineering, manufacturing and advanced production. Lease prices are quoted per plot and industry.

Samsung ecosystem Opportunities to join the supply chain of Samsung and other FDI groups in the region
Phase 1 layout Industrial land, infrastructure, green space, public and service areas
Map: Tay Pho Yen IP beside Thai Nguyen Ring Road 2, near the Yen Binh interchange on the Hanoi – Thai Nguyen Expressway
Click to view the larger map

Regionalconnectivity

The park is west of Pho Yen, near the Yen Binh interchange on the Hanoi – Thai Nguyen Expressway and Ring Road 5, with easy routes to Hanoi, Bac Ninh, Noi Bai Airport and Phu Tho.

  • Samsung, Yen Binh IP5–7min
  • Yen Binh interchange, Hanoi – Thai Nguyen Expressway10km
  • Noi Bai International Airport40min
  • Central Hanoi50min
  • Hai Phong port140min

Road travel times per brochure page 6. The distance to Samsung is read from the map on page 12, and to the Yen Binh interchange from the layout on page 11.

Regional connectivity map

Phase 1layout

The clickable plot map for Tay Pho Yen is being digitised from the planning drawings. In the meantime, you can view the overall layout or receive the plot drawings by email.

Overall layout of Tay Pho Yen IP Phase 1View larger
Total area
499ha
Operating period
2026 – 2076

The drawing shows

    Available plots at Song Cong II

    ViglaceraEcoSmart IP

    Viglacera's green and smart industrial park model. Tay Pho Yen applies this standard from the planning stage.

    • Resource saving

      Automatic irrigation. Rainwater is collected and treated wastewater is recycled for watering plants.

    • Clean energy

      Solar power for the operations building, lighting, pumping stations and treatment plants. Electric vehicle charging stations in the park.

    • Lower emissions

      60% of the greenery consists of species with high carbon absorption.

    • Environmental control

      Sludge segregation, automatic chemical dosing, and monitoring of wastewater, air and noise.

    • Solar power

      Cuts electricity costs by 15% a month and reduces CO₂ emissions.

    • Smart lighting

      Remote control, brightness adjustment and monitoring of each light, extending equipment life.

    • Wastewater monitoring

      Transparent monitoring of company discharges, in compliance with environmental protection rules.

    • AI security cameras

      Security monitoring, vehicle licence plate recognition and fire alerts.

    • Chemical control at treatment plants

      Tight control of chemical dosing so that effluent meets standards.

    • Fire alarm and incident reporting

      Fast detection and accurate alerts, in line with fire safety regulations.

    Integrated Operations Center (IOC)

    Located in the park's operations building. It monitors and controls all infrastructure in real time, ready to connect to the parent corporation and expand to the investor's management standards.

    Technicalinfrastructure

    Transport, power, water, wastewater treatment, telecoms, fire safety and security infrastructure is developed to be green, smart and sustainable.

    Corporateincome tax

    Projects that meet the legal conditions enjoy a preferential rate of 17% for 10 years: exempt for the first 2 years, then a 50% reduction of tax payable for the next 4 years.

    Years 1–2: tax exempt Years 3–6: 50% reduction, 8.5% Years 7–10: 17% tax rate

    17%

    The standard tax rate is currently 20%. The start of the incentive period and conditions of application follow Chapter V of Decree 320/2025/ND-CP dated 15 Dec 2025.

    Investors may also be exempt from import duty on machinery, equipment and materials under Law 107/2016/QH13.

    Import duty exemption list

    The chart illustrates the calculation and is not tax advice. Our specialist confirms the incentive for each project.

    Photogallery

    Click a photo to enlarge it. Drone photos and construction progress will be updated monthly.

    Frequently askedabout Tay Pho Yen

    Can't find the answer you need? Ask the automated assistant or call our specialist.

    Is a lease price available for Tay Pho Yen?

    No general price has been published yet. Our specialist sends an individual quotation based on the area, plot location and industry of your project.

    Which projects qualify for the 17% tax rate?

    Projects that meet the legal conditions pay 17% corporate income tax for 10 years: exempt for the first 2 years, then a 50% reduction of tax payable for the next 4 years.

    How close is the park to Samsung?

    From Tay Pho Yen IP to the Samsung site at Yen Binh IP is about 5–7 minutes via the Yen Binh interchange, according to the map in the brochure.

    What does Viglacera EcoSmart IP include?

    Greenery with high carbon absorption making up 60%, solar power for the operations building and plants, smart lighting, wastewater and air monitoring, AI cameras and the IOC integrated operations center.

    How long is the park's operating period?

    Tay Pho Yen IP Phase 1 operates from 2026 to 2076.

    Book asite visit

    Pick the date you would like to visit. Our team will call to confirm and prepare plot details that fit your needs.