Industrial ParkSong Cong II

Ba Xuyen ward, Thai Nguyen provincePhase 2, operating 2024–2074

Total area
296 ha
Land ready for handover
120.72 ha
Reference lease price
105 USD/m²

Rendering of Zone 2 from the brochure. The USD 105/m² price follows the current website, to be confirmed.

Land readyto build your factory

Song Cong II Industrial Park Phase 2 is developed by Viglacera Thai Nguyen, with integrated infrastructure and convenient connectivity. The park targets manufacturing, technology and supporting-industry companies that need a stable, long-term investment environment.

Total area
296ha
Zone 1
175ha
Zone 2
121ha

Operating period 2024 – 2074

Site clearance in Zone 2 is complete, so investors can plan factory construction with confidence. Zone 1 is under infrastructure development and open for pre-registration.

View layout and available plots
Map: Song Cong II IP and Tay Pho Yen IP beside the Hanoi – Thai Nguyen Expressway, Song Cong and Yen Binh interchanges
Click to view the larger map

Locationand distances

The park sits beside the Hanoi – Thai Nguyen Expressway, near the Song Cong interchange, with easy access to Thai Nguyen city, Hanoi, Noi Bai Airport and Hai Phong port.

  • Thai Nguyen city7km
  • Noi Bai International Airport55km
  • Central Hanoi78km
  • Hai Phong port174km

Distances per brochure page 9. Reference road travel times: about 40 minutes to Noi Bai, 50 minutes to central Hanoi.

Regional connectivity map

Layoutand plots

Available
4plots
Pre-registration
6plots
Zone 2
Immediate handover
  • Available
  • Leased

Technicalinfrastructure

Transport, power, water, wastewater treatment, telecoms, fire safety and security are developed in an integrated way to meet the needs of modern manufacturing.

Investmentincentives

Corporate income tax incentives depend on the industry, scale and conditions of each project. Our specialist confirms the applicable rate when sending a quotation.

    Import duty: 7 exemption cases
    1. Goods imported to produce export goods
    2. Goods imported to process export products
    3. Goods for scientific research and technology development
    4. Goods for environmental protection on the incentive list
    5. Goods forming fixed assets of incentivised projects
    6. Raw materials and components not yet produced domestically
    7. Up to 5 years' exemption on materials and components for specially preferred projects and high-tech companies

    Under the Law on Export and Import Duties 107/2016/QH13, as amended by Law 90/2025/QH15. The 5-year maximum exemption does not apply to mineral extraction projects or to production of goods subject to special consumption tax.

    Potential investment sectors

    • High technology, electronics
    • Supporting industries
    • Precision engineering
    • New materials
    • Clean energy, environment
    • Infrastructure, construction, logistics
    • High-tech agriculture, processing
    • Healthcare, support services
    Corporate income tax and detailed costs

    Projectprogress

    Key milestones of Phase 2. On the live website, Viglacera posts infrastructure progress photos every month so investors can follow remotely.

    1. 2022

      Completed

      Viglacera Thai Nguyen founded

      A joint stock company within the Viglacera ecosystem, developer of Song Cong II IP Phase 2 and Tay Pho Yen IP Phase 1.

    2. 2024

      Completed

      Operating period begins

      The operating period of Song Cong II IP Phase 2 runs for 50 years, from 2024 to 2074.

    3. To date

      Completed

      Zone 2 ready for handover

      Site clearance is complete, with 120.72 ha of land ready. POSCO Future M, Huali, LaserFlex, JY and Hunonic operate in the park.

    4. In progress

      Under construction

      Zone 1 infrastructure

      Power, water and internal roads are being built for the 175 ha. Six plots of 9 to 29 ha are open for pre-registration.

    Milestone years follow the brochure. Images are renderings from the brochure and will be replaced with site photographs.

    Photogallery

    Click a photo to enlarge it and use the arrow keys to move between photos. Drone video will be added once Viglacera provides the footage.

    Companies operating at Song Cong II

    • POSCO Future M
    • Huali
    • LaserFlex
    • JY
    • Hunonic

    Frequently askedabout Song Cong II

    Can't find the answer you need? Ask the automated assistant or call our specialist.

    Which zone of Song Cong II can I take over right away?

    Zone 2 (121 ha) has completed site clearance and is ready for handover. Zone 1 (175 ha) is expected for handover from Q2 2027 and is open for pre-registration.

    Until what year does the land lease run?

    The operating period of Song Cong II IP Phase 2 is 2024–2074. Land rent can be paid in one payment for the whole term.

    Is the power supply enough for a high-capacity factory?

    The park has two 110 kV substations of 3×63 MVA each, 6×63 MVA in total, plus the existing Song Cong 2 110 kV substation (50 MVA) and a reserve substation site according to the customer's power demand.

    What standard must wastewater meet?

    Factory wastewater is collected to the central treatment plant of 6,000 m³/day and treated to QCVN 40:2025/BTNMT Grade A before discharge to the environment.

    What types of buildings are allowed?

    Production factories, warehouses, operations offices and ancillary works such as parking sheds, guardhouses, substations and fire-fighting water tanks. Housing and groundwater extraction are not allowed.

    Book asite visit

    Pick the date you would like to visit. Our team will call to confirm and prepare plot details that fit your needs.